fbpx

The Swimming Pool Construction Process in Pakistan

Building a pool involves many steps. It would help if you did them right to get a fantastic result and let you and your family enjoy summer fun. Whether you are building the pool for family or for commercial purposes, it is necessary to learn about the swimming pool construction process.

Indeed, pools come in various shapes and sizes, but this does not affect the process of building them. In this blog, we will discuss the basics of building a pool in your backyard or for commercial purposes.

Swimming Pool Construction

The Process of Swimming Pool Construction in Pakistan

The following are the steps for building a pool in Pakistan based on the shape and size of the pool.

Step 1: Selection of Design and Location

The first step in building a pool is the design phase. This is where you select a pool design that fits the layout of the area where the pool will be constructed. Important considerations include the pool system, depth, size, shape, and overall area.

Additionally, the pool’s location should be accessible for regular maintenance, making a flat path an ideal choice. This can also save costs on excavation and filling.

Step 2: Excavation

The physical construction starts with excavation. The builder will outline the shape of the pool on the ground. After that, the machinery will dig the area as per the specifications of the design. Excavation consists of more than digging a hole. Remember, it is a delicate process where the contractor must look for the following:

Soil Conditions

The type of soil can affect excavation. The rocky, sandy or clay heavy soils present unique challenges.

Site Access

It means ensuring the excavation tool can reach the site without damaging other parts of your property.

Utility Lines

Proper checks should be made to prevent damage to underground utilities like water or gas lines.

Step 3: Building of Pool Base

The next step in the process of swimming pool is the pool base building. It is the vital phase. It will affect the life of the pool. Here, you perform the excavation so that the bottom becomes flat and uniform. Also, if the place has any loose filling, you compact it with firm soil.

Step 4: Steel Cage Reinforcement

The next step is to install the steel frame, which takes 2 to 3 weeks. Builders fit and bend the steel to get the desired shape. Also, this phase is the first sight of your pool and gives you a great idea of how your pool will look.

Step 5: Installation of Plumbing and Filtration System

The builders also install the plumbing and filtration system when installing the frame. It involves placing the pipes circulating water in and out of the pool. Proper plumbing ensures a sound filtration system for the pool. So, it keeps the water clean and safe.

Key components installed during this phase consist of the following:

Main Drains

These drains remove water from the bottom of the pool.

Skimmers

Skimmers are located around the edges of the pool and help remove debris from the surface of the water.

Returns

These are the inlets that circulate filtered water back into the pool.

Step 6: Concrete Shell or Pool Lining

Once the plumbing and steel framework are in place, the next step in building a pool is to create the actual pool structure. The process varies depending on the type of pool.

Concrete Pools

For concrete pools, shotcrete or gunite, both forms of sprayed concrete are applied to the steel framework. The mixture is sprayed under high pressure to form the shell of the pool. Once it cures, it creates a solid, durable structure that can be shaped into any design.

The curing process is necessary because it ensures structural integrity. It takes several weeks during which time; the shell must be kept moist to prevent cracks.

Fiberglass Pools

Fiberglass pools are pre manufactured and delivered as a single unit. After excavation, the fiberglass shell is lowered into place and leveled.

Vinyl-Lined Pools

Vinyl pools have a steel or polymer frame with a custom fit vinyl liner. Once the frame is made, the liner is installed to form the interior surface of the pool.

Step 7: Waterproofing the Concrete Pool

This step consists of tiles, ceramics, epoxy cement systems, and glass. The waterproofing process is selected based on the moisture condition and the water level of the area.

Step 8: Equipment Installation

Now the structure is ready, and it is time to install the final pieces of equipment like filters, pumps, heaters, and lightning. For quality swimming pool equipment and pool equipment installation, Water Solutions is the name that you can trust.

Step 9: Filling and Balancing the Water

With construction complete, it is time to fill the pool with water. After filling, the water must be chemically balanced to ensure that pH levels, chlorine, and other chemicals are within the proper range for safe swimming.

Conclusion: Swimming Pool Construction Process in Pakistan

When taking notes for swimming pool construction, be sure to focus on the steps discussed above. It is essential to hire experienced pool contractors and use high-quality swimming pool equipment for the best results. Water Solutions offers the best pool construction and maintenance services across Pakistan. Contact us today to bring your dream pool to life.

Table of Contents

Leave a Comment

Your email address will not be published. Required fields are marked *